CASE STUDY
Chapter: London Bridge
London Bridge was built on one of the tightest footprints in central London—wedged between Network Rail and St. Thomas Hospital. With no room for traditional tower cranes or lay-down areas, the team had to rethink everything.
Key Challenges
Cranes mounted on steel cantilevers over pit-lanes
Just-in-time delivery with zero margin for error
Wind tunnel effects from surrounding buildings
Record-breaking 2023/2024 storm season (12 named storms)

