CASE STUDY

Chapter: London Bridge

London Bridge was built on one of the tightest footprints in central London—wedged between Network Rail and St. Thomas Hospital. With no room for traditional tower cranes or lay-down areas, the team had to rethink everything.

Key Challenges

  • Cranes mounted on steel cantilevers over pit-lanes

  • Just-in-time delivery with zero margin for error

  • Wind tunnel effects from surrounding buildings

  • Record-breaking 2023/2024 storm season (12 named storms)

Download Case Study