Customer Feedback
-
“One of the biggest challenges we have when erecting a tower crane is running long taglines through a congested job site. Using Vita’s system can eliminate that. We did not have to run through an obstacle course, making it much more efficient and safer for the crew."
Josiah Rausch
Crane Tech Manager - CLS
-
"We have had so much productivity since not being winded off. We have now caught up with the steel company & now are waiting on them, whereas before they were waiting for us. This has 100% given the project the boost it needed, with being 100% better on productivity & giving the lifting operations an even greater safety factor.”
Billy Brant
AP - Kirby Group
-
"Thanks to the RocketCrane Tech Manager - CLS"Lever™️ now we have all the load fixed without any rotation within it, and we can hold a fixed position to GPS in the wind! An absolute game changer for lifting and cladding tall buildings with any large façade item that can’t be loaded in the hoist and launched from the slab."
Mark Willis - Operations Director
Thorp Precast Ltd
-
“Our lifting operations here are severely hampered by the fact that our 18.6mt diameter shaft only has a vertical Plenum opening 8.450mt x 5.200mt. Some of the loads we have to lift into the shaft are over 7.5mts wide and can be anything up to 30 Tonnes in weight.
The ability to rotate the Vita load device by remote control is a God send, enabling us to position the load in the precise orientation for safely entering the Plenum confines and lowering to pit bottom safely and without the fear of wall strikes during descent or wind action rotating the load mid lift.
I can safely say I will not hesitate to recommend this device and have done already to numerous other works managers here on HS2 and further afield.“
Steve Quinn
Project Manager - Vurce
-
"We were extremely happy with it, the VLN took a lot of the risk and hazard out of what we were doing. We had 19 men tied off to pieces of metal hanging there waiting for the next piece. Being able to maneuver the load without taglines and with precision ensured that the crew was able to place it without taking their hands off their spot, maintaining 3-point contact. When we returned to the project for the second time, the guys said they wouldn’t do it again unless the VLN were there. "
Randy LeRoux - Branch Manager - Sterling Crane, USA